Key Words:
Soil Treatment、supplementary survey、soil pollution
Abstract:
- In accordance with the relevant regulations of the Soil and Groundwater Remediation Law, the project provided the service of the supplementary survey on the area of soil pollution, and a soil pollution control plan was submitted. The soil pollution remediation work on the site was completed. The verification sampling was taken by Kaohsiung EPB after remediation work was complete, and obtain the official letter of delisting issued by the bureau.
- The project provided technical assistance and administrative coordination. Besides submission of control plan, Sinotech Engineer Service Ltd. also prepared presentation and report for EPB’s review.
Project Location:Kaohsiung City
Customer:Yucheng gas station co., ltd.
Service Period:From October 2018 to April 2020